Parking demand on a campus grows faster than the building it serves, and a lot that was adequate at opening can be overrun a few years later. Abilene Christian University enrolled a record 7,274 students in fall 2025, while McMurry University reported a record 4,144 including dual credit students, and numbers like those keep facilities offices busy with new stalls, drive aisles, overflow lots and accessible routes.

Concrete Contractors of Abilene builds parking lots in concrete for universities, school districts, hospitals, clinics, churches, retail centers and public buildings. The concrete trade partners pour and finish the pavement, and trade partners we coordinate prepare the subgrade and install lighting conduit, storm drainage and striping. The owner gets a single point of contact and a single set of records, from the proof roll of the subgrade through the last saw cut and the walkthrough that follows. Facilities staff in particular appreciate hearing about a conflict with an irrigation line or a buried conduit from us on Tuesday rather than discovering it on Friday.

Concrete lots appeal to owners who want a long-lasting surface that does not soften in July or require frequent sealing. They also perform well where trash trucks, buses and delivery vehicles turn repeatedly. We explain the design choices, show how they affect cost and let the owner decide how much surface life to buy. A written pavement section, a jointing plan and a drainage sketch go into every proposal, so the facilities committee can read what it is approving instead of trusting a bare square-foot number.

Owners with parking to build

Schools and healthcare owners lead the list, followed by commercial developers and church congregations expanding for growing attendance. Each has a distinct pattern of use: students arrive in waves, patients and visitors circulate through a medical campus all day, and shoppers favor close stalls near entries.

We ask owners about delivery trucks, emergency vehicle access, bus loading and snow or ice management, and we adjust the pavement thickness and joint layout accordingly. A lot designed only for passenger cars may fail quickly where a trash truck backs into the same corner every day. Dumpster pads and loading corners are therefore drawn as thicker, reinforced panels with their own joints, separated from the lighter stall areas.

Where lots go in around Abilene

North of downtown, Interstate 20 acts as a bypass between exits 279 and 292, and Loop 322 along with U.S. Highways 83, 84 and 277 also carries traffic through the city. Parking lots tend to follow those corridors, with retail and medical pads clustered at the interchanges and campus lots around the universities.

Our Abilene university district page describes how we approach campus work, including phasing so that students and staff keep access to parking while new sections are built. Outside the city, we travel to schools, churches and county facilities throughout the Big Country, and we price travel and mobilization openly instead of burying it in unit rates. A lot at a rural school costs the same per yard of concrete, but the haul and standby time are real and the owner should see them.

What the quote reflects

Cost depends on area, thickness, reinforcement, subgrade treatment, drainage structures, curb, lighting conduit, accessible stalls, saw cutting and the number of phases. Smaller lots cost more per square foot because mobilization is spread over less surface. Complicated shapes with many islands cost more than simple rectangles.

We usually present a base price with alternates for thickness or finish, for example a thicker section in truck lanes and a lighter one in stalls. That approach lets the owner place stronger concrete where traffic is heavy and save elsewhere. Owners with a limited first budget sometimes build the main drive and entry in concrete and leave overflow stalls for a later phase, and we design the first phase so the later one connects cleanly.

Keeping the lot open

Phasing is the main scheduling challenge. A campus or clinic cannot close its entire lot, so we plan the work in sections, with temporary routes and signage. Concrete needs time to cure, which means a section is often unavailable for several days before it can be reopened.

Weather influences the calendar. Coleman gets about 27.88 inches of rain and melted precipitation in a normal year and has recorded 114 degrees F, and similar swings across the Big Country mean we plan for both rain delays and extreme heat. Pours are scheduled in the morning, and curing is protected. Winter breaks and summer recesses are popular windows for school and university lots, though July heat means a summer start must begin before sunrise and a winter start must watch for frozen subgrade.

The work we perform

Our scope includes demolition of old pavement if needed, subgrade preparation in coordination with our earthwork partners, base placement, forming, reinforcement, concrete placement, finishing, joint sawing, curing and sealing. We also install curb and gutter, wheel stops, bollard sleeves and light pole bases as the plans require.

Accessible stalls and routes get special attention. We check cross slopes at each accessible stall, build ramps with the correct landings and coordinate striping with the pavement marking contractor. Lots drain to inlets or open channels, and we verify with a level and, where conditions allow, with a water test. Wheel stops and parking blocks are located from the layout after striping lines are agreed, never from memory.

Services that go with the lot

Parking areas connect to other flatwork. See our pages on curb and gutter, sidewalks and flatwork and concrete paving for details on edges, walks and heavy-duty sections.

Medical and school sites also appear in our building type pages for medical offices and education buildings. In each case the lot is only part of the project, and we help the owner coordinate it with the rest of the work, including the utility trenches that cross the lot, the lighting contractor's conduit and the landscape irrigation that must stay clear of pavement edges.

Plan the lot with the facilities office

Please send the site plan, the traffic you expect and any phasing limits to our estimating desk. We will review the layout with you, draft an approach that keeps essential parking open and prepare an estimate with the alternates that matter.

Common Questions

How long does a concrete parking lot last?

With proper design and maintenance it can serve for many years. Joint sealing and occasional panel repairs keep it in good shape, and the surface does not rut the way asphalt can under standing loads.

Can we use the lot soon after the pour?

Light vehicles can usually enter after several days and heavier trucks after the concrete reaches design strength. We confirm with test results and agree on the reopening date with the owner.

Do you handle striping?

We coordinate with a pavement marking contractor and prepare the surface so paint adheres. Accessible stall layouts and symbols are checked against the plan before they are painted.

What about drainage?

Drainage is designed with slopes to inlets or edges, and we verify grades during forming. If ponding appears, we diagnose the cause and correct it before acceptance.

Can a lot be built in phases?

Yes. Phasing is common on campuses, and we plan sections, temporary routes and dowelled joints between phases so the finished lot works as one surface.